Project Highlight
It is a compacted concrete gravity dam 1,500 meters upstream from the current dam. The new reservoir will have a capacity of 81.7 cubic hectometres that will allow the storage of water together with the Dam of the Bridge, which is already built a total of 104.84 cubic hectometres, more than double the current volume.